Credit committee paper · October 2026

Business case for Lancaster Group

R50m Trade Finance Facility for the Arnot RB2 Export Corridor

Self-liquidating logistics pre-finance: Arnot Coal Mine → Sunberry Siding → Durban Port (FOB)

Lender IRR, all-in
21.3%
RB2 exported / month
50kt
Security cover / shipment
3.1x
Facility income, yr 1
R5.2m

Prepared on behalf of Arnot OpCo | October 2026 | Confidential

For decision

The request to the credit committee

Resolution sought

Approve a R50m revolving trade finance facility to Arnot OpCo for 12 months, priced at Prime + 4% (14.75%) with a 2% raising fee, funding 80% of road and rail invoices on RB2 exports through Durban, repaid from irrevocable LCs confirmed by an SA bank.

Tenor
12 months, revolving
Advance
80% of logistics
Repayment
LC at sight
Draw-stop
Applies
Lender IRR
21.3%
Prime + 4% plus 2% fee
Year-1 income
R5.2m
R4.16m interest + R1.0m fee
Security cover
3.1x
R100.3m FOB cargo vs R32.4m
Peak drawn
R44.3m
R5.7m headroom under R50m

Executive summary

A short-dated, cargo-backed credit

01

The opportunity

Arnot sells RB2 at $121 FOB Durban (R2,006/t at R16.58/$) against a landed FOB cost of R1,610/t, a R386/t margin after royalty. The constraint is working capital: R810/t of road and rail must be paid before the vessel loads.

02

The facility

R50m revolving, 12 months, financing 80% of logistics invoices. Each tranche self-liquidates from irrevocable LC proceeds ~40 days after first drawdown, turning the limit over 7.8x a year (R389m financed).

03

The cushion

Arnot stays profitable down to $98/t or R13.44/$: about 19% below today's price and 19% below today's exchange rate.

Credit view

Why this is a strong credit

Self-liquidating

Each tranche is repaid from LC proceeds within ~40 days. No refinancing risk, no term exposure.

Asset-backed

Coal in transit is worth 3.1x the funds advanced, with proceeds ceded to a Lancaster-controlled collection account.

Margin absorbs shocks

A R386/t margin covers finance costs 45x. Arnot's breakeven is $98/t, against $121 today.

Producing asset

51.3 Mt ROM reserves, a mining right valid to 2039, an ungeared balance sheet and an existing Eskom CSA.

Contents

Work through the case

Open Scenario in the header to test your own assumptions. Every page recalculates live.

  1. 02

    Export corridor & cash cycle

    Follow a 50kt cycle from mine to LC proceeds, day by day.

  2. 03

    Unit economics

    Revenue, cost and margin per ton of RB2 at any price and exchange rate.

  3. 04

    Drawdown profile

    Weekly drawn balance against the R50m limit, with draw-stop logic.

  4. 05

    Returns to Lancaster

    Interest, fee, yield and all-in IRR from daily cash flows.

  5. 06

    Sensitivity & stress

    Price × FX grid, payment lag, rail shortfall and price-fall cover.

  6. 07

    Risks, security & terms

    Mitigants, the security package and a committee review checklist.