Credit committee paperSection 06 / 07

06 · Sensitivity

Sensitivity: price, FX and payment timing

Arnot stays profitable down to $98/t or R13.44/$. Losses need a large price fall and a stronger rand at the same time.

Exhibit 6.1 · Price × FX

Arnot net margin, R/t, after finance costs

Click any cell to load that price and exchange rate into the scenario.

$/t \ R/$R15.50R16.00R16.58R17.00R17.50
$101
$111
$121
$131

Note · Outlined cell is the current scenario. Finance cost held at R8.61/t. Losses appear only if the price falls ~$20/t and the rand strengthens to R16.00/$ or below at the same time.

Exhibit 6.2 · Payment timing

Unconstrained peak exposure by LC payment lag

Peak with draw-stop at a 10-day lag
R44.3m
Covenant not needed

A lag over ~15 days would push exposure past the limit. A draw-stop (no new cycle until the prior LC has paid) keeps Lancaster inside the limit; the cost is shipment timing, not credit loss.

Exhibits 6.3–6.4 · Stress tests

Rail shortfall and price falls

Exhibit 6.3

Transnet rail performance

Fewer railings mean less drawn; the fee stays intact.

RailingsAvg drawnLender IRRArnot net
100% of planR25.7m21.3%R227m
80% of planR20.6m22.5%R181m
60% of planR15.4m24.7%R136m
40% of planR10.3m29.3%R90m

Exhibit 6.4

Cargo cover under price falls

FOB value of coal in transit ÷ funds advanced.

Price fallRB2 priceCoverArnot R/t
Scenario$121/t3.10xR378
−10%$109/t2.79xR178
−20%$97/t2.48x(R22)
−30%$85/t2.17x(R221)
−40%$73/t1.86x(R421)

Note · Even when Arnot's margin turns negative, Lancaster's tranche is still covered by the cargo and repaid from the LC: a price fall erodes the borrower's profit before it reaches the lender's security.