02 · Corridor
The export corridor and cash cycle
Lancaster funds only the logistics leg: R810/t of road and rail that Arnot must pay before coal reaches the vessel. The cargo and the LC sit behind every rand advanced.
Exhibit 2.1 · Physical flow
Mine to vessel to collection account
Arnot Mine
RB2 loaded
FOT R800/t
Road haul
To Sunberry siding
R150/t
Funded 80%
Transnet rail
Incl. port handling
R660/t
Funded 80%
Durban Port
FOB vessel
$121/t
LC proceeds
Collection account
Repays Lancaster
Note · Gold stages are the invoices Lancaster pre-finances. Advance per cycle: R32.4m (80% × R810/t × 50kt).
Exhibit 2.2 · Interactive
Walk through the cash cycle
Drag the day marker to see which tranches are outstanding and what Lancaster has at risk.
Principal outstanding, day 35
R38.9m
of a R50m limit
Exposure rises as invoices are paid, peaks while one cycle awaits its LC and the next has started, then drops back as proceeds land in the Lancaster-controlled collection account. This walk-through shows principal only; the R44.3m facility peak also allows for accrued interest and invoice timing.
Exhibit 2.3 · Timeline
Key milestones per cycle
- Step 1
Day 0 to 30
Lancaster pays 80% of road and rail invoices as coal moves to port
- Step 2
Day 30
Vessel loads at Durban; B/L and inspection certificate issued
- Step 3
Day 40
LC pays at sight into the collection account; tranche and interest settle
- Step 4
Monthly
The next 50kt cycle starts; peak exposure is R44.3m when cycles overlap